Frankfurt am Main

Upper Zeil

Overall concept for technical equipment- ensuring costs, quality and schedules are upheld during construction of a complex property
Directly on Hauptwache square in downtown Frankfurt: the new-build “Upperzeil” is being realized on the site of the former Zeilgalerie. To this end, the upper seven stories were torn down and the four basement levels gutted. CANZLER planned the entire technical equipment for the project. To create larger sales areas, the position of the utility shaft and ducts needed to be optimized. At the same time, the technical interfaces needed to be designed to expand the anchor tenant and supply the other independent store units. The cross-trade supervision and control during the construction phase and site supervision were likewise part of the services commissioned.
Share article

Project data

Object details:
Downtown shopping mall with a sales area of about 15,000 m²
Client:
RFR Ma­nage­ment / DC Values
Architect:
KSP Jürgen Engel Archi­tekten
GFA:
17.000 m2

Canzler Plus

Masterful technical solutions, even when things get tight. Construction work in existing buildings – lock into our decades of experience in technical equipment to have a decisive advantage in your planning.

Provided services

Manage

Quality management
Photo:
© Fotograf Klaus Helbig