Düsseldorf

Four Elements

Trouble-free operation of component activation through expert services and warranty tracking
In the "Four Elements" property, there were various defects in the heating and cooling technology after commissioning. CANZLER analysed the causes by monitoring different operating modes of the systems, the control engineering and the delivery rates of the pumps. As a result, various deficiencies disturbed the system operation of the component activation lastingly and made rooms useless. On the basis of the analysis CANZLER developed appropriate measures to eliminate the deficiencies, supervised their implementation and carried out the technical acceptances.
Share article

Project data

Object details:
6-storey office and commercial building with two-storey underground car park, on Düsseldorf‘s urban north-south axi
Client:
Warburg-HIH Invest
Architect:
Petzinka Pink
GFA:
14.800 m2
Photo:
© pixabay