Magdeburg
Experimental Factory
Overall planning of technical equipment and media supply for a multifunctional laboratory and research building
An experimental factory was planned at the traditional university location of Magdeburg, with its multitude of inventions and developments in mechanical and plant engineering.
With the object, the prerequisite was created for innovative product, process and organisational development for medium-sized companies using existing research capacities.
CANZLER took over the overall planning of technical equipment for the new building. The space allocation plan included chemical laboratories, electrical laboratories, measuring rooms, an experimental hall and multifunctional conference rooms with presentation technology and large screen. All rentable research and experiment areas are equipped with fast internet LAN connections and numerous other media supplies such as water, gases, compressed air etc.
Project data
Object details:
New construction of a product development and research centre
Client:
Zentrum für Produkt-, Verfahrens- und Prozessinnovations GmbH
Architect:
Sauerbruch Hutton Gesellschaft von Architekten mbH
GFA:
6.700 m2
Provided services
Planning
Technical equipmentPhoto:
© Mattis Kaminer – iStock
© Mattis Kaminer – iStock