Essen

Evonik - Laboratory and office space

Planning and site supervision of the technical equipment for the extension of existing laboratory and office space
A warehouse on the Evonik production site in Essen was to be extended by an internal laboratory and office area. For this purpose, an area of about 250m² was built on the ground floor according to the "house within a house" principle. Media technology, the sanitary, heating and ventilation systems and the supply of technical laboratory gases had to be planned. The connections were made to the existing technical installations as far as possible. CANZLER was responsible for the planning and object monitoring services of the technical equipment for the trades heating, ventilation, air conditioning, sanitation and building automation.
Share article

Project data

Object details:
Integrated laboratories and office space in an existing building (warehouse) at a production site of the specialty chemicals industry
Client:
Evonik Technology & Infrastructure
GFA:
250 m2

Provided services

Photo:
© gorodenkoff – iStock