Essen

Evonik / Goldschmidt Laboratory Building E18

Re-planning and redesign of technical equipment to comply with fire protection, workplace guidelines and accident prevention regulations
The laboratory building, completed in 1981 on the 27-hectare site of Evonik Goldschmidt GmbH, has been extensively rebuilt, expanded, and adapted through changes of use over the course of its use. The balances of the air volumes at the workplaces, digestors and exhaust systems no longer complied with the current workplace guidelines, and the entire air conditioning systems no longer corresponded to the state of the art. In a first step CANZLER carried out extensive functional tests and prepared an inventory of the fire protection and all ventilation systems with measurements of the air quantities and air flows. In the next step CANZLER developed a planning concept for the repair and new regulation of all systems.
Share article

Project data

Object details:
6-storey laboratory building with RLT and extraction systems with an air volume flow of 200,000 m³/h
Client:
Evonik Goldschmidt GmbH
GFA:
8.400 m2
Photo:
© gorodenkoff – iStock