Taufkirchen

Airbus Defence and Space

Design of electrical systems and site supervision for the refurbishment and new build of an administration, research and laboratory building during ongoing operations.
The headquarters of HENSOLDT AG in Munich-Ottobrunn were to be modernized and extended. The building complex, located close to the Airbus site, consists of an existing building and a new extension. The ground floor of the extension building houses the new representative reception area, conference rooms and a meeting room. The upper floors house laboratories and offices. CANZLER planned and supervised the implementation of the upgrading of the safety systems such as the fire alarm system, safety lighting and separation systems, as well as the necessary adaptations and renewals of the electrical installations in the existing building and the electrical installations in the new building. As part of the project, the complex was disconnected from the internal Airbus network and connected to its own medium voltage connection/transformer station of the public utility company. The entire project was designed and executed to the highest safety standards.
Share article

Project data

Object details:
Existing six-storey office and laboratory building and new six-storey prestigious conference, office and laboratory building
Client:
Hensoldt AG
Architect:
BKLS Archi­tekten + Stadtplaner BDA
GFA:
32.000 m2

Provided services

Photo:
© Hensoldt